Skip to main content

My process flow “TEST”  starts when Open_Job_Flow Task is runned on “table1”

The task “Open_Job_Flow” is also linked on “table2”, but when i run the task from “table2” the process flow does not start.

 

If i change the process action type from “Start table task” to “Start task” the process flow “TEST”  does not run also on “table1”.

How can i “link” the process flow to both tables without create a copy of the process flow “TEST”  ?

 

 

 

You can set both table task as the starting point. Like this: