My process flow “TEST” starts when Open_Job_Flow Task is runned on “table1”
The task “Open_Job_Flow” is also linked on “table2”, but when i run the task from “table2” the process flow does not start.
If i change the process action type from “Start table task” to “Start task” the process flow “TEST” does not run also on “table1”.
How can i “link” the process flow to both tables without create a copy of the process flow “TEST” ?