When the Software Factory was using project and project version, you were able to synchronize old project versions. This is a very powerful tool. Sometimes you need to synchronize an old version (for example you have 2 acceptation environments enabled 1 using version 1.2.1 and another using 1.2.2. In some cases you would had to fix an issue encountered in both version and synchronize both version again to IAM.
This was no issue in the past, but with the new platform I can see that I can change the project version (model version) when generation from the creation screen, but I cannot set this when synchronizing?
Is there a way to synchronize an old model version to IAM (not the latest).