The easiest way to refresh a subject is by using the refresh interval in seconds.
We have a subject (process) with a detail tab (steps). Based on the status (active) of a row in process the detail tab (steps) should refresh automatically. When the status of the process is ‘finished’ refreshing of the detail tab should stop.
You can compare it with the generation process in the SF. The main difference is, that I could select older processes that are already finished.
The easiest way for me would be if there was an extra parameter in the context procedure for subjects with the auto refresh indicator. Based on the status off the process I could stop refreshing the steps.
An alternative could be to start a process flow when selecting a row. It is more work for me, but on the other side it gives more opportunities.

