Skip to main content
Open

Linking requirements/work items to control procedures

Related products:Software Factory
  • June 23, 2021
  • 2 replies
  • 39 views

K.Bakkenes
Captain
Forum|alt.badge.img+9

When analyzing a ticket or reviewing code it is very hard to find the requirement or work item for a created control procedure.  

As a work-around some developers place the id of a control procedure in a work item. However, control procedure id’s can change during development or be completely removed. So this creates a mismatch.
 


It would be a nice feature if requirements/work items can be linked to control procedures and vice versa. Shown as a detail tabpage for the requirements, work items and control procedures.

2 replies

Mark Jongeling
Administrator
Forum|alt.badge.img+23
Updated idea status NewOpen

Ricky
Superhero
Forum|alt.badge.img+8
  • Superhero
  • February 8, 2022

This would help us speed up the validation process due to wanting to have traceable code.