When analyzing a ticket or reviewing code it is very hard to find the requirement or work item for a created control procedure.
As a work-around some developers place the id of a control procedure in a work item. However, control procedure id’s can change during development or be completely removed. So this creates a mismatch.
It would be a nice feature if requirements/work items can be linked to control procedures and vice versa. Shown as a detail tabpage for the requirements, work items and control procedures.
This would help us speed up the validation process due to wanting to have traceable code.