When you copy a project version, the Software Factory automatically gets the current project version +0.10. I always change that to +0.01. For example: If I'm copying project version 1.34 to a new version, the SF suggests 1.44, but I want it to be 1.35. Maybe make the project version number increment a variable that you can set per project?
I'd like to use a slider as an user interface control. In this way, I could configure the column/domain to have a certain range and increment.
I'd like to rename cube views, but there is no task available to do so. Due to related cube view fields I can't do so manually.
I'd like to measure the productivity of SF developers (for example trainees) in the IAM. Now I can check the 'use log user actions' in IAM, or use the session/action analysis, but I'd like to see their activity on a day to day basis to see what they are doing and when/how long this takes. Maybe this can be solved with some default cube views on those analysis, but I think additional functionality (like a report) could give some usefull insights. Especially for the management of trainees, this can be a usefull tool. Not to 'spy' on them ofcourse, but to give insights and a topic of conversation during review meetings.
I'd like a task to renumber my requirements. Now the number gets auto-generated, but when I change requirements the numbers seem off and not logical.
I'd like to use the kanban board in the Software Factory, but one of the drawbacks for me is the lack of nested work items. I'd like to be able to group them. For example: a work item to create a table, and this parent work item has child work items like datamodelling, UI/UX, setup of the combined filter, screentypes etc.
Within the new business process module in the Software Factory, you can't see who created or updated a process. I would like to see trace fields here.
Since a few releases ago the GUI support grid groups. I noticed that I often use the same groups in the grid as in the form. Nowadays often I finish the form and copy it to the grid to get the same sequence and visibility. It would be great if the group and corresponding labels would be copied too,
While configuring roles in my project, I noticed that the roles look similar to activities in the process analysis. For example 'new quotation' and 'send quotation'. I think it would be a nice addition to the Software Factory if it would be possible to convert certain process activities (user requirements) into roles.
I'd like the process flow modeler to remember the ‘Show order no:’ setting in the modeler itself. Now it disables the setting when you exit the designer.
Currently, in the validations for translated objects, the object type in the tree is displayed with its database value instead of the look-up value. I'd like it to be the look-up value so I don't have to open the form to see the object type. Object type
Already have an account? Login
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.